Notes: HURRICANE DEBBY RAIN EVENT 8/9/24. FOAMY SCUM ON WATER ACCUMULATING AT EDGES OF STREAM -
Curry Creek Monitoring Event Graph

This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.

Event Results

Scroll down to view the event results for each monitoring location.

Location Analyte Value Units Remarks Location
Curry Creek Beckhorn
(CUBH)
Total Phosphorus (as P) 245.0 ug/L Lab
Temperature 21.0 C Field
Specific Conductance 115.0 uS/cm Lab
Soluble Reactive Phosphorus (as P) 37.1 ug/L Exceeded 15 min. holding time for filtration Lab
Solids, Total Suspended 554.0 mg/L Lab
Nitrate-+Nitrite-Nitrogen (as N) 0.29 mg/L Lab
Kjeldahl Nitrogen, Total (as N) 1.87 mg/L Lab
E. Coli 11400.0 Colonies/100 ml Lab