Trumansburg Creek Synoptic Monitoring Event on July 18, 2023, under Base Flow conditions
Trumansburg Creek Monitoring Event Graph
This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.
Event Results
Scroll down to view the event results for each monitoring location.
Location | Analyte | Value | Remarks | Location |
---|---|---|---|---|
Curry Road | Solids, Total Suspended | 0.72 mg/L | non-detect | Lab |
Specific Conductance | 534.0 uS/cm | Lab | ||
Chloride | 35.3 mg/L | Lab | ||
Total Phosphorus (as P) | 15.3 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 0.93 mg/L | Lab | ||
E. Coli | 65.0 Colonies/100 ml | Lab | ||
Temperature | 17.0 C | Field | ||
Turbidity | 1.3 NTU | Lab | ||
Soluble Reactive Phosphorus (as P) | 14.1 ug/L | Exceeded 15 min. holding time for filtration | Lab | |
Lake Street Bridge | Solids, Total Suspended | 0.72 mg/L | non-detect | Lab |
Chloride | 39.2 mg/L | Lab | ||
Turbidity | 1.2 NTU | Lab | ||
Temperature | 19.5 C | Field | ||
Specific Conductance | 524.0 uS/cm | Lab | ||
Total Phosphorus (as P) | 13.7 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 1.01 mg/L | Lab | ||
Soluble Reactive Phosphorus (as P) | 8.61 ug/L | Exceeded 15 min. holding time for filtration | Lab | |
E. Coli | 30.0 Colonies/100 ml | Lab | ||
Boardman Creek | Specific Conductance | 408.0 uS/cm | Lab | |
Chloride | 13.4 mg/L | Lab | ||
Total Phosphorus (as P) | 14.1 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 1.04 mg/L | Lab | ||
Temperature | 17.0 C | Field | ||
E. Coli | 200.0 Colonies/100 ml | Lab | ||
Solids, Total Suspended | 0.72 mg/L | non-detect | Lab | |
Turbidity | 1.4 NTU | Lab | ||
Soluble Reactive Phosphorus (as P) | 10.5 ug/L | Exceeded 15 min. holding time for filtration | Lab | |
Camp Barton | Soluble Reactive Phosphorus (as P) | 36.4 ug/L | Exceeded 15 min. holding time for filtration | Lab |
Temperature | 20.0 C | Field | ||
Specific Conductance | 540.0 uS/cm | Lab | ||
Chloride | 48.0 mg/L | Lab | ||
Turbidity | 1.5 NTU | Lab | ||
Total Phosphorus (as P) | 51.5 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 2.32 mg/L | Lab | ||
E. Coli | 30.0 Colonies/100 ml | Lab | ||
Solids, Total Suspended | 0.72 mg/L | non-detect | Lab | |
Kjeldahl Nitrogen, Total (as N) | 0.29 mg/L | Estimate | Lab | |
Outfall of Sewage Plant | Solids, Total Suspended | 0.72 mg/L | non-detect | Lab |
Specific Conductance | 1154.0 uS/cm | Lab | ||
Chloride | 188.0 mg/L | Lab | ||
E. Coli | 50.0 Colonies/100 ml | non-detect | Lab | |
Total Phosphorus (as P) | 794.0 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 25.5 mg/L | Lab | ||
Temperature | 20.0 C | Field | ||
Turbidity | 1.2 NTU | Lab | ||
Soluble Reactive Phosphorus (as P) | 596.0 ug/L | Exceeded 15 min. holding time for filtration | Lab | |
Salo Drive | Specific Conductance | 459.0 uS/cm | ||
Temperature | 18.0 C | Field | ||
Chloride | 18.7 mg/L | |||
Total Phosphorus (as P) | 9.94 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 1.1 mg/L | Lab | ||
E. Coli | 25.0 Colonies/100 ml | Lab | ||
Turbidity | 0.7 NTU | |||
Solids, Total Suspended | 0.72 mg/L | non-detect | Lab | |
Soluble Reactive Phosphorus (as P) | 9.39 ug/L | Exceeded 15 min. holding time for filtration | Lab |