Great Gully Creek Synoptic Monitoring Event on September 26, 2022, under Base Flow conditions
Great Gully Creek Monitoring Event Graph
This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.
Event Results
Scroll down to view the event results for each monitoring location.
Location | Analyte | Value | Remarks | Location |
---|---|---|---|---|
Great Gully Creek Mouth | Kjeldahl Nitrogen, Total (as N) | 0.42 mg/L | Estimate | Lab |
Specific Conductance | 637.0 uS/cm | Lab | ||
Total Phosphorus (as P) | 25.2 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 0.92 mg/L | Lab | ||
E. Coli | 50.0 Colonies/100 ml | non-detect | Lab | |
Chloride | 34.9 mg/L | Lab | ||
Turbidity | 1.1 NTU | Lab | ||
Temperature | 13.0 C | Field | ||
Soluble Reactive Phosphorus (as P) | 19.7 ug/L | Exceeded 15 min. holding time for filtration | Lab | |
Solids, Total Suspended | 0.72 mg/L | non-detect | Lab | |
Great Gully Creek @ Chase Rd. & Rt. 34B | Specific Conductance | 804.0 uS/cm | Lab | |
Total Phosphorus (as P) | 312.0 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 0.49 mg/L | Lab | ||
Kjeldahl Nitrogen, Total (as N) | 1.13 mg/L | Lab | ||
Chloride | 67.0 mg/L | Lab | ||
Turbidity | 2.0 NTU | Lab | ||
Solids, Total Suspended | 1.71 mg/L | Lab | ||
E. Coli | 500.0 Colonies/100 ml | Lab | ||
Temperature | 13.0 C | Field | ||
Soluble Reactive Phosphorus (as P) | 250.0 ug/L | Exceeded 15 min. holding time for filtration | Lab |