Synoptic Monitoring Event on September 09, 2012
for Catatonk Creek under Base Flow conditions
Notes: Not all QC requirements were met for this event: Calibration standards were not recorded; duplicates were measured for pH and Dissolved Oxygen only. Conductivity, total hardness and pH measurements for CKR site were verified with certified lab split, allowing values to be entered with \"Not all QC criteria were met\" in the remarks.
Catatonk Creek Monitoring Event Graph
This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.
Event Results
Scroll down to view the event results for each monitoring location.
| Location | Analyte | Value | Units | Remarks | Location |
|---|