Kashong Creek Synoptic Monitoring Event on May 05, 2024, under Base Flow conditions
Kashong Creek Monitoring Event Graph
This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.
Event Results
Scroll down to view the event results for each monitoring location.
Location | Analyte | Value | Remarks | Location |
---|---|---|---|---|
Bridge at Route 14 | Solids, Total Suspended | 2.0 mg/L | Lab | |
Kjeldahl Nitrogen, Total (as N) | 0.58 mg/L | Lab | ||
Specific Conductance | 647.0 uS/cm | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 1.5 mg/L | Lab | ||
Temperature | 13.0 C | Field | ||
E. Coli | 325.0 Colonies/100 ml | Lab | ||
Total Phosphorus (as P) | 18.2 ug/L | Lab | ||
Soluble Reactive Phosphorus, Field-Filtered (as P) | 5.34 ug/L | Lab |