Pony Hollow Creek Synoptic Monitoring Event on November 02, 2023, under Base Flow conditions
Pony Hollow Creek Monitoring Event Graph
This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.
Event Results
Scroll down to view the event results for each monitoring location.
Location | Analyte | Value | Remarks | Location |
---|---|---|---|---|
Chaffee Creek @ Route 13 | Solids, Total Suspended | 0.63 mg/L | non-detect | Lab |
Chloride | 8.75 mg/L | Lab | ||
Specific Conductance | 281.0 uS/cm | Lab | ||
Total Phosphorus (as P) | 9.63 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 0.94 mg/L | Lab | ||
Temperature | 8.0 C | Field | ||
E. Coli | 10.0 Colonies/100 ml | non-detect | Lab | |
Turbidity | 1.2 NTU | Lab | ||
Soluble Reactive Phosphorus (as P) | 10.5 ug/L | Exceeded 15 min. holding time for filtration | Lab | |
Pony Hollow Creek @ Cayuta Rd. | E. Coli | 20.0 Colonies/100 ml | Lab | |
Turbidity | 3.4 NTU | Lab | ||
Solids, Total Suspended | 1.25 mg/L | Lab | ||
Chloride | 15.8 mg/L | Lab | ||
Specific Conductance | 302.0 uS/cm | Lab | ||
Total Phosphorus (as P) | 42.6 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 1.16 mg/L | Lab | ||
Temperature | 5.0 C | Field | ||
Soluble Reactive Phosphorus (as P) | 41.3 ug/L | Exceeded 15 min. holding time for filtration | Lab |