Notes:
Pony Hollow Creek Monitoring Event Graph

This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.

Event Results

Scroll down to view the event results for each monitoring location.

Location Analyte Value Units Remarks Location
Pony Hollow Creek @ Cayuta Rd.
(PHCR)
Turbidity 6.6 NTU Lab
Total Phosphorus (as P) 16.0 ug/L Lab
Temperature 14.0 C Field
Specific Conductance 150.0 uS/cm Lab
Soluble Reactive Phosphorus (as P) 8.3 ug/L Exceeded 15 min. holding time for filtration Lab
Solids, Total Suspended 1.75 mg/L Lab
Nitrate-+Nitrite-Nitrogen (as N) 0.79 mg/L Lab
E. Coli 280.0 Colonies/100 ml Lab
Chloride 8.93 mg/L Lab
Chaffee Creek @ Route 13
(CH13)
Turbidity 4.0 NTU Lab
Total Phosphorus (as P) 20.1 ug/L Lab
Temperature 14.0 C Field
Specific Conductance 108.0 uS/cm Lab
Soluble Reactive Phosphorus (as P) 11.3 ug/L Exceeded 15 min. holding time for filtration Lab
Solids, Total Suspended 0.63 mg/L non-detect Lab
Nitrate-+Nitrite-Nitrogen (as N) 0.19 mg/L Lab
E. Coli 160.0 Colonies/100 ml Lab
Chloride 2.74 mg/L non-detect Lab
Pony Hollow Creek @ Driveway Crossing
(PHJH)
Turbidity 7.2 NTU Lab
Total Phosphorus (as P) 18.5 ug/L Lab
Temperature 14.0 C Field
Specific Conductance 100.0 uS/cm Lab
Soluble Reactive Phosphorus (as P) 9.08 ug/L Exceeded 15 min. holding time for filtration Lab
Solids, Total Suspended 0.63 mg/L non-detect Lab
Nitrate-+Nitrite-Nitrogen (as N) 0.59 mg/L Lab
E. Coli 180.0 Colonies/100 ml Lab
Chloride 5.14 mg/L Lab