Notes:
Pony Hollow Creek Monitoring Event Graph

This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.

Event Results

Scroll down to view the event results for each monitoring location.

Location Analyte Value Units Remarks Location
Pony Hollow Creek @ Cayuta Rd.
(PHCR)
Turbidity 5.3 NTU Lab
Total Phosphorus (as P) 22.3 ug/L Lab
Temperature 10.0 C Field
Specific Conductance 320.0 uS/cm Lab
Soluble Reactive Phosphorus (as P) 5.33 ug/L Exceeded 15 min. holding time for filtration Lab
Solids, Total Suspended 11.3 mg/L Lab
Nitrate-+Nitrite-Nitrogen (as N) 1.5 mg/L Lab
E. Coli 250.0 Colonies/100 ml Lab
Chloride 17.6 mg/L Lab
Chaffee Creek @ Route 13
(CH13)
Turbidity 3.5 NTU Lab
Total Phosphorus (as P) 7.75 ug/L Lab
Temperature 7.0 C Field
Specific Conductance 253.0 uS/cm Lab
Soluble Reactive Phosphorus (as P) 2.98 ug/L Exceeded 15 min. holding time for filtration Lab
Solids, Total Suspended 1.5 mg/L Lab
Nitrate-+Nitrite-Nitrogen (as N) 0.68 mg/L Lab
E. Coli 150.0 Colonies/100 ml Lab
Chloride 4.96 mg/L Estimate Lab
Pony Hollow Creek @ Driveway Crossing
(PHJH)
Turbidity 70.0 NTU Lab
Total Phosphorus (as P) 101.0 ug/L Lab
Temperature 7.0 C Field
Specific Conductance 89.7 uS/cm Lab
Soluble Reactive Phosphorus (as P) 10.2 ug/L Exceeded 15 min. holding time for filtration Lab
Solids, Total Suspended 135.0 mg/L Lab
Nitrate-+Nitrite-Nitrogen (as N) 0.89 mg/L Lab
E. Coli 650.0 Colonies/100 ml Lab
Chloride 4.09 mg/L Estimate Lab