Pony Hollow Creek Synoptic Monitoring Event on June 14, 2018, under Base Flow conditions
Pony Hollow Creek Monitoring Event Graph
This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.
Event Results
Scroll down to view the event results for each monitoring location.
Location | Analyte | Value | Remarks | Location |
---|---|---|---|---|
Pony Hollow Creek @ Driveway Crossing | Temperature | 11.0 C | Field | |
Specific Conductance | 90.0 uS/cm | Lab | ||
Chloride | 9.1 mg/L | Lab | ||
Turbidity | 4.1 NTU | Lab | ||
Soluble Reactive Phosphorus (as P) | 19.1 ug/L | Exceeded 15 min. holding time for filtration | Lab | |
Total Phosphorus (as P) | 35.2 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 0.844 mg/L | Lab | ||
E. Coli | 120.0 Colonies/100 ml | Lab | ||
Total Nitrogen | 0.55 mg/L | Not certifiable | Lab | |
Chaffee Creek @ Route 13 | Temperature | 10.0 C | Field | |
Specific Conductance | 288.0 uS/cm | Lab | ||
Chloride | 11.7 mg/L | Lab | ||
Turbidity | 1.2 NTU | Lab | ||
Soluble Reactive Phosphorus (as P) | 18.8 ug/L | Exceeded 15 min. holding time for filtration | Lab | |
Total Phosphorus (as P) | 28.6 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 1.1 mg/L | Lab | ||
E. Coli | 20.0 Colonies/100 ml | Lab | ||
Total Nitrogen | 0.73 mg/L | Not certifiable | Lab | |
Pony Hollow Creek @ Cayuta Rd. | Temperature | 10.0 C | Field | |
Specific Conductance | 337.0 uS/cm | Lab | ||
Chloride | 16.7 mg/L | Lab | ||
Turbidity | 1.9 NTU | Lab | ||
Soluble Reactive Phosphorus (as P) | 21.1 ug/L | Exceeded 15 min. holding time for filtration | Lab | |
Total Phosphorus (as P) | 27.8 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 1.69 mg/L | Lab | ||
E. Coli | 760.0 Colonies/100 ml | Lab | ||
Total Nitrogen | 0.95 mg/L | Not certifiable | Lab |