Tug Hollow Creek Synoptic Monitoring Event on June 04, 2018, under Base Flow conditions
Tug Hollow Creek Monitoring Event Graph
This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.
Event Results
Scroll down to view the event results for each monitoring location.
Location | Analyte | Value | Remarks | Location |
---|---|---|---|---|
Glen Eldridge Creek Mouth | Temperature | 14.5 C | Field | |
Specific Conductance | 309.0 uS/cm | Lab | ||
Solids, Total Suspended | 10.0 mg/L | Lab | ||
Soluble Reactive Phosphorus (as P) | 16.8 ug/L | Exceeded 15 min. holding time for filtration | Lab | |
Total Phosphorus (as P) | 21.0 ug/L | Lab | ||
Nitrate-+Nitrite-Nitrogen (as N) | 0.39 mg/L | Lab | ||
Kjeldahl Nitrogen, Total (as N) | 0.31 mg/L | estimate | Lab | |
E. Coli | 140.0 Colonies/100 ml | Lab | ||
Total Coliform | 6660.0 Colonies/100 ml | Lab |